YourTradie YourTradie Electrical & Airconditioning

Guide · Adelaide

7 signs you need a switchboard upgrade

Your switchboard is the one part of the house's wiring you can see without going in the roof. Here are the signs it's time for an upgrade, and what one involves.

By James Nicholls, licensed electrician and aircon installer (PGE 331257)

YourTradie electrician mounting a new switchboard enclosure in a brick wallLicensed for both trades

Get your free
web quote

Tell me the job, where it is and how to reach you. Photos help me give a firm price.

Please add your name.
Please add a number I can text.
Please add the suburb.
A line or two about the job helps me price it.
Please check the email address.

Same‑day reply, 7 days a week. Rather talk? Call or text 0422 502 855.

That didn't send — your connection may have dropped. Try again, or call 0422 502 855.

The signs

Check your board for these:

  • 1. Ceramic fuses with wire in them. These are rewireable fuses, and they're often rewired with the wrong wire
  • 2. No safety switches (RCDs), or safety switches on only some circuits
  • 3. Circuits that trip or fuses that blow when a few appliances run together
  • 4. Scorch marks, a burning smell, buzzing, or a board that feels warm
  • 5. A black or brown backing board in an older home, which may contain asbestos
  • 6. No room left for new circuits when you want an aircon, EV charger, solar or a renovation
  • 7. Double adaptors and power boards everywhere because there aren't enough circuits

Why safety switches matter

A safety switch cuts the power in a fraction of a second when electricity leaks to earth, through a faulty appliance, a damaged lead or a person. It's the single biggest safety upgrade you can make to an older house.

Plenty of older Adelaide homes still don't have safety switches on every circuit.

What an upgrade involves

A new enclosure with circuit breakers and safety switches (RCDs or RCBOs), every circuit tested and labelled, and room left for future circuits. Most homes take half a day to a full day, with the power off for part of it.

If the old board is on an asbestos-backed panel, it's replaced, not drilled into.

You get a certificate of compliance for the work.

Get a price from photos

Send a photo of the board with the cover open and one of the meter box from a step back. You'll usually get a fixed price back the same day, and it doesn't change once I'm on site.

Questions

Common questions

Why are ceramic fuses a problem?

They're easy to rewire with the wrong wire, which lets a circuit overheat instead of cutting out, and they give no protection against electric shock. If your board still has them, it's time to upgrade.

Do I need a switchboard upgrade for a new aircon?

Not always. If there's room on the board and it's in good condition, a new circuit can usually be added. If not, I'll tell you before the job.

How long does a switchboard upgrade take?

Most homes are half a day to a full day.

Want a fixed price?

Send a few photos and the details. You'll usually have a price back the same day.

Call Get a quote